Difference: Phase2CosmicTestStand (19 vs. 20)

Revision 202015-08-18 - bornheim

Line: 1 to 1
 
META TOPICPARENT name="Phase2Upgrade"
Changed:
<
<

tLab at Caltech (superfast timing radiation detectros)

>
>

CPT Lab

Caltech Precision Timing Laboratory for Superfast Detection of Ionizing Radiation.

 
Changed:
<
<
PI: M. Spiropulu
Senior Researchers: Adi Bornheim, Artur Apresyan
Fellows: Si Xie
Heroes (students): Cristian Pena, Javier Duarte, Dustin Anderson, Cedric Flamant
>
>
PI : M. Spiropulu
Senior Researchers : Adi Bornheim, Artur Apresyan

Fellows : Si Xie
Students : Cristian Pena, Javier Duarte, Dustin Anderson, Cedric Flamant

  Collbarorators: Anatoly Ronzhin (FNAL), Henry Frisch (UofC), Tommaso Tabarelli de Fatis (Milano)

TestStandPictures.jpg

Line: 13 to 16
 

Testbeams and Labtests

  1. Cosmic Tests at Caltech
Changed:
<
<
  1. First Fermilab test with LYSO crystals March 2014
  2. Fermilab test with MCP
  3. Second Fermilab test with LYSO crystals
>
>
  1. January 2014 (FNAL), MCPs : https://docs.google.com/document/d/1F1XvDfKYb2JSJ3vCUWWReNkT6BtbYcIR1OHUkC4nqOI/edit#heading=h.mol9e6tvye9u
  2. March 2014 (FNAL), Initial test beam with LYSO crystals and MCPs : https://docs.google.com/document/d/1GYsBSIjC6k96b38mkspa5osM5qCnrWGoTixfONRzSr8/edit
  3. May 2014 (FNAL), Second test beam with LYSO crystals and MCPs : https://docs.google.com/document/d/1hdCVS206nGHyX1Z5UrgidJL6r58B9wfJ3_pJ-mkMIH4/edit
  4. July/August 2014 (FNAL), Third test beam with LYSO crystals (On timing properties of LYSO-based calorimeters
    Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, Volume 794, 11 September 2015, Pages 7-14
    D. Anderson, A. Apresyan, A. Bornheim, J. Duarte, C. Pena, A. Ronzhin, M. Spiropulu, J. Trevor, S. Xie) : https://docs.google.com/document/d/1WuU4-cmjtvqZQPTnCD3Yl3sQmqqUdlelKrUF3Z8SKNs/edit
  5. August 2014 (FNAL), T-1058 : https://docs.google.com/document/d/1i-r00ktf6ydpZKrSLVp-ZYwRhoMJP3Rc_R8DDChNNTA/edit
 
  1. SiPM test Aashrita
  2. Fall 2014 Shashlik test in CERN H2: Logbook : https://docs.google.com/document/d/1yg9_EdqDACuyLg3wbaqcxarsu863YgItCsGREvfXesw/edit Runlist : https://docs.google.com/spreadsheets/d/1tJW37Ni9heD0QvJk6UDtVc4pY5aoEfR9OOeXOkhG3jM/edit#gid=0
  3. Shashlik cosmic and laser tests in CERN(light yield calibration of LYSO cube and SH cell, timing between MCPs with laser) :
Line: 23 to 28
 
  1. Laser tests at Caltech February/March 2015 (few ps resolution between MCPs with ps laser) : https://docs.google.com/document/d/1_m2a6X2-KoLP-Ov0V5Kn-nfRooie1tXWHr5mGowX0_A/edit
  2. May 2015 Shashlik test in CERN H4
  3. July 2015 Shashlik test in CERN H2
Added:
>
>



October 2014 (CERN): https://docs.google.com/document/d/1yg9_EdqDACuyLg3wbaqcxarsu863YgItCsGREvfXesw/edit

January 2015 (FNAL): https://docs.google.com/document/d/1r1WGOQmV3bFKSEErWHlAphnxHyS_xJ7ob3mCI3LnVQY/edit

March 2015 (FNAL): https://docs.google.com/document/d/11L2i1iEK_03RmI66uWERq-gdg6eKJSnFropcGZkxv4M/edit
 

Initial test setup

  1. RemoteDesktopTestStand.txt
  2. SecondStepTestStand.txt
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback