Difference: Phase2Upgrade (28 vs. 29)

Revision 292013-06-26 - bornheim

Line: 1 to 1
 
META TOPICPARENT name="AdiBornheim"

Caltech Phase II Upgrade twiki UpgradeLogo.png

Physics studies :
Line: 51 to 51
 
  1. 1-s2.0-S0168900210028779-main.pdf: LYSO PET scanner
  2. LaBr3 and LYSO monolithic crystals coupled to photosensor arrays for TOF-PET : Dendooven_CERN_030210.ppt: Dendooven_CERN_030210.ppt
  3. On pulse shaping : V-3-Resolution-2.pdf: V-3-Resolution-2.pdf
Added:
>
>
  1. More on signal processing : http://www-physics.lbl.gov/~spieler/
 
  1. Proposed hardware setup : PhaseII_Timing_V2.ppt, PhaseII_Timing_V3.ppt, PhaseII_Timing_V4.ppt
CMS Shashlik and general EE R&D:
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback