Difference:
TimingConferenceTalks
(7 vs. 8)
Revision 8
2016-04-12 -
bornheim
Line: 1 to 1
META TOPICPARENT
name="Phase2Upgrade"
Conference Talks
Line: 25 to 25
"Study of the timing performance of micro-channel plate photomultiplier for use as an active layer in a shower maximum detector", NIM-A,
http://dx.doi.org/10.1016/j.nima.2015.06.006
"Direct tests of micro channel plates as the active element of a new shower maximum detector",NIM-A,
http://dx.doi.org/10.1016/j.nima.2015.05.029
"Precision Timing Calorimetry for High Energy Physics", NIM-A,
http://dx.doi.org/10.1016/j.nima.2015.11.129
Changed:
<
<
"Si timing December TB", submitted to NIMA
>
>
"Test Beam Studies Of Silicon Timing for Use in Calorimetry", NIM-A,
doi:10.1016/j.nima.2016.04.031
-- Main.bornheim - 2014-05-14
META FILEATTACHMENT
attachment="Cicero-Catilina.jpg" attr="" comment="" date="1400059077" name="Cicero-Catilina.jpg" path="Cicero-Catilina.jpg" size="43936" user="bornheim" version="1"
View topic
|
H
istory
:
r14
<
r13
<
r12
<
r11
|
More topic actions...
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback