Difference: Phase2Upgrade (7 vs. 8)

Revision 82013-05-07 - bornheim

Line: 1 to 1
 
META TOPICPARENT name="AdiBornheim"

Caltech Phase II Upgrade twiki UpgradeLogo.png

Jet timing studies (aka the Sepehr Studies) :
Line: 27 to 27
 
  1. Renyuan on crystal timing : http://www.hep.caltech.edu/~zhu/talks/ryz_110428_time_resolution.pdf
  2. Timing Performance Study of New Fast PMs : TimingPerformanceStudyofNewFastPMs06332552.pdf
  3. Calor LYSO Resolution Thiel IEEE 2008 : calor_lyso_resolution_thiel_ieee_2008.pdf:
Changed:
<
<
CMS Shashlik R&D :
>
>
CMS Shashlik and general EE R&D:
 
  1. ShashlikCrystalMatrixBudget _ryzhbn032713 : ShashlikCrystalMatrixBudget_ryzhbn032713.pptx
  2. Monte Carlo studies of the CMS Electromagnetic
    Endcap Calorimeter : cmstn_2000_030.pdf: cmstn_2000_030.pdf
  3. CMS ECAL Endcap Geometry Specification: cmstn_2000_029.pdf: cmstn_2000_029.pdf
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback